The trail to Sulzenau hut and Sulzenaualm is now provisional fixed and accessible again.
The Stubai High Trail bridges over the Sulzenau stream at Sulzenau hut are also re-erected.
Because of temporary flooding of the trail at 11.August,
repair works were necessary where the trails was buried by water masses and gravel.